Analisis Re-Layout Line Machining Oil Separator dengan Metode Value Stream Mapping dalam Meningkatkan Efisiensi Produktivitas di PT Astra Otoparts Divisi Nusametal

Authors

  • Adji Nur Rasyid Departemen Teknik Mesin, Sekolah Vokasi, Universitas Gadjah Mada
  • Ignatius Aris Hendaryanto Departemen Teknik Mesin, Sekolah Vokasi, Universitas Gadjah Mada
  • Widia Setiawan Departemen Teknik Mesin, Sekolah Vokasi, Universitas Gadjah Mada
  • Agustinus Winarno Departemen Teknik Mesin, Sekolah Vokasi, Universitas Gadjah Mada

DOI:

https://doi.org/10.30588/jeemm.v8i2.1848

Keywords:

process cycle efficiency, re-layout, VALSAT, value stream mapping

Abstract

The Oil Separator is a part produced by PT Astra Otoparts Nusametal Division. The products are manufactured on the machining line. The production process of part oil separator through several stages including CNC milling and lathe machining, washing part, and part verification process. Line machining oil separators have been found to have waste problems, namely moving manpower, waiting time process, and inappropriate processing, causing work imbalances in the production process. The job imbalance causes the daily production target not to be achieved as the company planned, so the customer needs cannot be met. The problem in this study was solved using the value stream mapping method to analyze the waste occurring and the impact resulting from the relayout line machining oil separator. The waste analysis is done by spreading questionnaires, waste weighting, value stream analysis tools selection (VALSAT), and cause analysis with fishbone diagrams. After that, some improvements were made to reduce the waste. Implementation of improvements resulted in a reduction in the number of work processes from 72 to 47. Thus, the lead time for process line machining oil separator decreased from 521 seconds/cycle to 444 seconds/ cycle with an increase in the total process cycle efficiency of 8.67%. In addition, the productivity of the previous average number of parts of 6575 pcs/day was increased to 7024 pcs / day and the manpower was reduced from five manpowers/day to three manpowers/day.

Keywords: Process Cycle Efficiency, Re-layout, VALSAT, Value Stream Mapping

References

Apple, James, M. (1990). Tata Letak Pabrik dan Pemindahan Bahan ( terjemahan N. M.T.Mardiono (ed.); Edisi Keti). ITB.

Arif, M. (2017). Perancangan Tata Letak Pabrik. Deepublish.

Daulay, M., Amri, A., & Syukriah, S. (2021). Analisis Waste pada Proses Pembongkaran Peti Kemas dengan Pendekatan Lean Service di PT Pelindo I Cabang Lhokseumawe. Industrial Engineering Journal, 10(2).

Gaspersz, V. (2012). All In One Management Toolbook, Contoh Aplikasi pada Bisnis dan Industry Modern. Gramedia Pustaka Utama.

Hines, P., & Rich, N. (1997). The Seven Value Stream Mapping Tools. International Journal of Operations and Production Management, 17(1), 46–64.

Jannah, M., & Siswanti, D. (2014). Analisis Penerapan Lean Manufacturing untuk Mereduksi Over Production Waste Menggunakan Value Stream Mapping dan Fishbone Diagram. Jurnal Riset Ekonomi, Manajemen, Bisnis Dan Akuntansi, 2(3), 254–265.

Muhsin, A., Djawoto, Susilo, P., & Muafi. (2018). Hospital Performance Improvement Through the Hospital Information System Design. International Journal of Civil Engineering and Technology, 9(1), 918–928.

Rother, M. and Shook, J. (1999). Leaning to See. : Value Stream Mapping to Add Value and Eliminate Muda. The Lean Enterprise Institute.

Safitri, N. D., Ilmi, Z., & Amin, M. (2018). Analisis Perancangan Tataletak Fasilitas Produksi Menggunakan Metode Activity Relationship Chart (ARC). Jurnal Manajemen, 9(1), 38.

Trimarjoko, A., Fathurohman, D. M. H., & Suwandi, S. (2020). Metode Value Stream Mapping dan Six Sigma untuk Perbaikan Kualitas Layanan Industri di Automotive Services Indonesia. IJIEM - Indonesian Journal of Industrial Engineering and Management, 1(2), 91.

Downloads

Published

2024-10-03

How to Cite

Rasyid, A. N., Hendaryanto, I. A., Setiawan, W., & Winarno, A. (2024). Analisis Re-Layout Line Machining Oil Separator dengan Metode Value Stream Mapping dalam Meningkatkan Efisiensi Produktivitas di PT Astra Otoparts Divisi Nusametal. Jurnal Engine: Energi, Manufaktur, Dan Material, 8(2), 96–105. https://doi.org/10.30588/jeemm.v8i2.1848

Issue

Section

Articles

Most read articles by the same author(s)

Similar Articles

1 2 > >> 

You may also start an advanced similarity search for this article.