Analisis Potensi Pembangkit Listrik Tenaga Surya (PLTS) di Gedung Kantor Bupati Kabupaten Temanggung
Keywords:
PVSyst, PLTS, Kabupaten TemanggungAbstract
The government has targeted a 23% increase in the use of renewable energy by 2025. The Ministry of Energy and Mineral Resources (ESDM) in Indonesia has taken steps to achieve this goal by issuing Circular Letter No. 363/22/MEM.L/2019, urging the installation of rooftop solar power systems (PLTS) on buildings. In response to this directive, the office of the regent of Temanggung Regency has been designated for the installation of rooftop PLTS. To ensure the proper implementation of the PLTS installation, calculations were made to assess the potential, including observing the geographical location of the building, its condition, rainfall and climate intensity, as well as solar radiation intensity. The installation of the grid-connected PLTS took place at the main building of the regent's office in Temanggung. Simulations were conducted using PVSyst 7.2.6 software, resulting in an annual electricity potential of 3795 kWh. The solar panel modules used were mono 250 Wp 60 cell Bifacial models, totaling 11 units with a 30° elevation angle. The highest electricity potential occurs in July, with an array output of 449 kWh.
References
Al Hakim, R. R. (2020). Model Energi Indonesia, Tinjauan Potensi Energi Terbarukan untuk Ketahanan Energi di Indonesia: Sebuah Ulasan. Jurnal Pengabdian Kepada Masyarakat (ANDASIH), 1(1). https://doi.org/10.57084/andasih.v1i1.374
Builder Indonesia. (2021). PLTS Atap, Wajib Paham Ini Sebelum Memasang PLTSAtap.https://www.builder.id/plts-atap/
Databoks.katadata.co.id. (2021). Konsumsi ListrikPer Kapita Indonesia Capai 1.109kWH pada Kuartal III 2021.https://databoks.katadata.co.id/datapublish/2021/12/10/konsumsi-listrikper-kapita-indonesia-capai-1109kwh-pada-kuartal-iii-2021
Kompas.com.(2022). Jumlah Penduduk Indonesia2022. https://nasional.kompas.com/read/2022/04/27/03000051/jumlahpenduduk-indonesia-2022
Nugroho, A. P., & Kurniawan, D. (2021). Potensi Pembangkit Listrik Tenaga Surya Rooftop di Gedung Mohammad Hatta, Universitas Proklamasi 45. Jurnal Offshore: Oil, Production Facilities and Renewable Energy, 5(1), 12-19.http://dx.doi.org/10.30588/jo.v5i1.935
Ridho, M. A., Winardi, B., & Nugroho, A.(2019). Analisis Potensi Dan UnjukKerja Perencanaan PembangkitListrik Tenaga Surya (PLTS) DiDepartemen Teknik ElektroUniversitas DiponegoroMenggunakan Software Pvsyst 6.43.Transient: Jurnal Ilmiah TeknikElektro, 7(4), 883-890. https://doi.org/10.14710/transient.v7i4.883-890
Shofiyana, N., Supriyadi, I., Al Qarni, M. U. (2022). Transisi Energi Indonesia Pasca Pandemi Covid-19 dan Konflik Militer Rusia-Ukraina. Jurnal Kewarganegaraan, 6(2). https://doi.org/10.31316/jk.v6i2.3375
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2024 Arum Damasari, Fitri Nur Afifah, Andri Prasetyo Nugroho

This work is licensed under a Creative Commons Attribution 4.0 International License.
Authors who publish with Jurnal Teknik Industri Manajemen dan Manufaktur agree to the following terms:
Authors retain copyright and grant the Jurnal Teknik Industri Manajemen dan Manufaktur right of first publication with the work simultaneously licensed under a Creative Commons Attribution 4.0 International License that allows others to share (copy and redistribute the material in any medium or format) and adapt (remix, transform, and build upon the material) the work for any purpose, even commercially with an acknowledgment of the work's authorship and initial publication in Jurnal Teknik Industri Manajemen dan Manufaktur
Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgment of its initial publication in Jurnal Teknik Industri Manajemen dan Manufaktur. Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).