Analisis Potensi Pembangkit Listrik Tenaga Surya (PLTS) di Gedung Kantor Bupati Kabupaten Temanggung

Authors

  • Arum Damasari Program Studi Teknik Lingkungan, Fakultas Teknik, Universitas Proklamasi 45
  • Fitri Nur Afifah Program Studi Teknik Lingkungan, Fakultas Teknik, Universitas Proklamasi 45
  • Andri Prasetyo Nugroho Program Studi Teknik Lingkungan, Fakultas Teknik, Universitas Proklamasi 45 https://orcid.org/0000-0003-3896-5740

Abstract

The government has targeted a 23% increase in the use of renewable energy by 2025. The Ministry of Energy and Mineral Resources (ESDM) in Indonesia has taken steps to achieve this goal by issuing Circular Letter No. 363/22/MEM.L/2019, urging the installation of rooftop solar power systems (PLTS) on buildings. In response to this directive, the office of the regent of Temanggung Regency has been designated for the installation of rooftop PLTS. To ensure the proper implementation of the PLTS installation, calculations were made to assess the potential, including observing the geographical location of the building, its condition, rainfall and climate intensity, as well as solar radiation intensity. The installation of the grid-connected PLTS took place at the main building of the regent's office in Temanggung. Simulations were conducted using PVSyst 7.2.6 software, resulting in an annual electricity potential of 3795 kWh. The solar panel modules used were mono 250 Wp 60 cell Bifacial models, totaling 11 units with a 30° elevation angle. The highest electricity potential occurs in July, with an array output of 449 kWh.

Downloads

Published

2024-08-13

How to Cite

Arum Damasari, Fitri Nur Afifah, & Andri Prasetyo Nugroho. (2024). Analisis Potensi Pembangkit Listrik Tenaga Surya (PLTS) di Gedung Kantor Bupati Kabupaten Temanggung. Jurnal Teknik Industri Manajemen Dan Manufaktur, 1(1), 16–24. Retrieved from https://ejournal.up45.ac.id/index.php/jtim/article/view/1863